Certifications & conformity

The standards that apply to our product families, the conformity route for each market, and the honest status of each document.

We do not publish certificates we do not hold. Every row below shows the certificate number and validity date once it is supplied by the company. A blank means the document is still being collected — it is not a claim of certification.
Standard / schemeScopeReference
EN 14351-1Windows and external pedestrian doorsets
CE marking route
To be confirmed
EN 13830Curtain walling — product standard
CE marking route
To be confirmed
EN 12207 / 12208 / 12210Air / water / wind resistance testing
Test reports per system
To be confirmed
TR CU (EAEU)Building products under applicable technical regulations
EAC conformity
To be confirmed
GOST-KKazakhstan national conformity (outside TR CU)
Certificate
To be confirmed
ISO 9001Quality management system
Management certificate
To be confirmed
QualicoatPowder coating quality label
Coating licence
To be confirmed
Compliance routes

Why the two markets need different documents

European Union

Construction products sold in the EU are regulated by the Construction Products Regulation. Windows fall under the harmonised standard EN 14351-1 and curtain walling under EN 13830. CE marking requires a declaration of performance backed by testing, usually by a notified test body.

In practice: your architect will ask for the DoP and the test report before accepting a submittal. We provide both for the tested system.

EAEU & national schemes

Kazakhstan, Kyrgyzstan and Armenia apply EAEU technical regulations (TR CU). Products within the scope require an EAC certificate or declaration; products outside that scope fall back to national conformity assessment such as GOST-K.

Uzbekistan and Tajikistan run their own national certification systems with frequent updates. We agree the exact route per shipment with your importer.

Need the test report for a specific system?

Tell us which series and which market; we will send the current status and the test plan.